- Galllery walls going up.
- Gallery foundations.
- Gallery walls up, insulated.
- Gallery heated floor.
- Gallery floor poured 2003.
- Gallery floor poured 2003.
- Gallery roof made extra strong 2003.
- I-beam supports for gallery ceiling.
- Roofing over the gallery.
- Gallery structure completed.
- New gallery covered to ground level 2003.
- Gallery hidden from view.
- Service tunnel walls extended 2003.
- Digging out service tunnel 2003.
- Service tunnel beam supports 2003.
- Service tunnel ready for ceiling 2003.
- Service tunnel roofed 2003.
- Service tunnel covered, hidden from sight.
- Inside the tunnel.
- Starting to fill up.
- Some systems installed in service tunnel.
- HVAC control units.
- Water treatment controls 2005.
- Mist fire suppression tanks 2005.
- Service tunnel nears breaking point 2005.
- Underpinning north end, gallery dug.
- Digging the gallery, basement.